電着塗装事業部

電着塗装ライン生産工程

  • 01輸入検査

    Receiving inspection

  • 02LOADING

    LOADING

  • 03タンセ (DIP),50-60℃

    Hot water cleaning (dip),50-60℃

  • 04予備脱脂 (SPRAY) 50-60℃

    Pre-degreasing (spray) 50-60℃

  • 05脱脂#1 (DIP), 50-60℃

    Degreasing #1 (dip), 50-60℃

  • 06脱脂#2 (DIP), 50-60℃

    Degreasing #2 (dip), 50-60℃

  • 07水洗#1 (SPRAY)

    Water cleaning #1 (spray)

  • 08水洗#2 (DIP)

    Water cleaning #2 (dip)

  • 09表面調整 (DIP)

    Surface Conditioning(dip)

  • 10화성피막 (DIP) 40-45℃

    Phosphasing (dip) 40-45℃

  • 11スセ#3 (SPRAY)

    Water cleaning #3 (spray)

  • 12スセ#4 (DIP)

    Water cleaning #4 (dip)

  • 13純粋税#1 (DIP)

    D.I water cleaning #1 (dip)

  • 14睡眠

    Dehydration

  • 15電着塗装 (DIP) 30℃±1

    Electrodeposition coating (dip) 30℃±1

  • 16UF#1 (SPRY)

    Ultrafiltration#1 (spray)

  • 17UF#2 (DIP)

    Ultrafiltration#2 (dip)

  • 18UF#3 (DIP)

    Ultrafiltration#3 (dip)

  • 19純粋税#2 (SPRAY)

    D.I water cleaning #2 (spray)

  • 20セッティングゾーン

    Setting zone

  • 21乾燥炉(LNG) 200℃±10

    Drying (LNG) 200℃±10

  • 22UN-LOADING

    Unloading

  • 23出荷検査

    Shipment inspection

  • 24梱包/出荷

    Packaging / shipping